| Home || Organization || Operation || Consumers || Tariff Details || Form Archive || Tenders || Billing || Otherlinks || Contact Us |
 
 


Southern Electricity Supply Company of Orissa Ltd.
Corporate Office: Courtpeta, Berhampur, Ganjam – 760004, Orissa
Phone: 091-680-220 8897, Fax: 091-680-220 2261



TARIFF NOTIFICATION 2008-09

The 20th March, 2008

RETAIL SUPPLY TARIFF EFFECTIVE FROM 1st APRIL, 2008

        In exercise of the powers conferred under section 64(3) and other related provisions of the Electricity Act, 2003, the Orissa Electricity Regulatory Commission has passed common order on 20.03.2008 in Case No.64, 65, 66 & 67 of 2007 with regard to determination of ARR and Retail Supply Tariff for CESU, WESCO, NESCO and SOUTHCO, with effect from 01.04.2008.

        Pursuant to Regulation 57 of the OERC (Conduct of Business) Regulations, 2004, the SOUTHCO hereby publishes the Retail Supply Tariff and other charges as below . .

    
1. The Tariff and other charges applicable to the electricity consumers as approved in pursuance of OERC Retail Supply Tariff order dated 20.03.2008 for the FY 2008-09 shall be applied in the licensee’s area of supply as per the given Schedule for all consumption on and after 01.04.2008, until further order of the Commission.

2. The Electricity Duty levied by the Govt. of Orissa under the Orissa Electricity (Duty) Act, 1961 and any other statutory levy/duty/tax/cess/toll imposed under any law from time to time shall be charged, over and above the tariff payable by the consumers in accordance with the law.

3. The detailed order of the Commission is available in its web site www.orierc.org as well as in the web site of the licensee www.southcoorissa.com




Place: Berhampur                                                                             CHIEF EXECUTIVE OFFICER     
Dated: 20.03.2008
                                                                                         
SOUTHCO




RETAIL SUPPLY TARIFF EFFECTIVE FROM 1st APRIL, 2008

Sl. No.

Category of Consumers

Voltage of Supply 

Demand Charge (Rs./KW/ Month)/ (Rs./KVA/ Month)        

Energy Charge  (P/kWh)

Customer Service Charge (Rs./
Month)

Monthly Minimum Fixed Charge for first KW or part (Rs.)

Monthly Fixed Charge for any additional KW or part (Rs.)

Rebate
(P/kWh)/DPS

 

LT Category

1

Domestic

 

 

 

 

 

 

 

1.a

Kutir Jyoti  < 30U/month

LT

FIXED MONTHLY CHARGE ---->

30

 

 

1.b

Others

 

 

 

 

 

 

10

 

 (Consumption <= 100 units/month)

LT

   

140

   

20

10

   

 

 (Consumption >100, <=200 units/month)

LT

 

230

  

20

10

 

 

 (Consumption >200 units/month)

LT

    

310

  

20

10

 

2

General Purpose < 110 KVA

  

  

 

 

 

  

10

 

 (Consumption <=100 units/month)

LT

   

320

 

30

20

   

 

 (Consumption >100, <=300 units/month)

LT

   

410

  

30

20

   

 

 (Consumption >300 units/month)

LT

 

450

 

30

20

 

3

Irrigation Pumping and Agriculture

LT

 

110

 

20

10

10

  Agro Industrial Consumers LT   110   20 10 10

4

Public Lighting

LT

 

320

 

20

10

DPS/Rebate

5

L.T.Industrial (S) Supply

LT

 

320

 

40

30

10

6

L.T.Industrial (M) Supply

LT

 

320

 

80

50

DPS/Rebate

7

Specified Public Purpose

LT

 

320

 

50

50

DPS/Rebate

8

Public Water Works and Swerage Pumping<110 KVA

LT

 

320

 

50

50

10

9

Public Water Works and Swerage Pumping >=110 KVA

LT

200

320

30

 

 

10

10

General Purpose >= 110 KVA

LT

200

320

30

 

 

DPS/Rebate

11

Large Industry

LT

200

320

30

 

 

DPS/Rebate

 

HT Category

12

Bulk Supply - Domestic

HT

10

230

250

 

 

10

13

Irrigation

HT

30

100

250

 

 

10

  Agro Industrial Consumers HT 30 100 250     10

14

Specified Public Purpose

HT

50

 

 

 

 

As
indicated
in the notes
below

 

 

 

250

 

 

DPS/Rebate

15

General Purpose < 110 KVA

HT

50

250

  

 

10

16

H.T.Industrial (M) Supply

HT

50

250

 

 

DPS/Rebate

17

General Purpose >= 110 KVA

HT

200

250

 

 

DPS/Rebate

18

Public Water Works and Swerage Pumping

HT

200

250

 

 

10

19

Large Industry

HT

200

250

 

 

DPS/Rebate

20

Power Intensive Industry

HT

200

250

 

 

DPS/Rebate

21

Ministeel Plant

HT

200

250

 

 

DPS/Rebate

22

Railway Traction

HT

200

250

 

 

DPS/Rebate

23

Emergency  Supply to CPP

HT

0

400

250

 

 

DPS/Rebate

24

Colony Consumption

HT

0

230

0

 

 

DPS/Rebate

 

EHT Category

25

General Purpose

EHT

200

As
indicated
in the notes
below

700

 

 

DPS/Rebate

26

Large Industry

EHT

200

700

 

 

DPS/Rebate

27

Railway Traction

EHT

200

700

 

 

DPS/Rebate

28

Heavy Industry

EHT

200

700

 

 

DPS/Rebate

29

Power Intensive Industry

EHT

200

700

 

 

DPS/Rebate

30

Ministeel Plant

EHT

200

700

 

 

DPS/Rebate

31

Emergency  Supply to CPP

EHT

0

380

700

 

 

DPS/Rebate

32

Colony Consumption

EHT

0

230

0

 

 

DPS/Rebate

 

D.C. Services

 

RATE FOR D.C. SUPPLY

 

34

Domestic

LT

SAME AS RATE AT SL. 1

10

35

General Purpose < 110 KVA

LT

SAME AS RATE AT SL. 2

10

36

L.T.Industrial (S) Supply

LT

SAME AS RATE AT SL. 5

10


NOTE
:


Energy Charges for HT & EHT Consumers
Load Factor (%) HT EHT
up to 50% 300 p/u 290 p/u
>50% to = <60% 225 p/u 202 p/u
>60% 220 p/u 202 p/u

For details, the orders of the Commission may be referred.



NOTE:

(i) Three phase consumers with static meters are allowed to avail TOD Tariff excluding Public Lighting @10 paise/unit for energy consumed during off peak hours. Drawl by the industries during off-peak hours upto 120% of Contract Demand without levy of any penalty has been allowed. The “Peak hours” is defined as 6.00 A.M. to 10.00 A.M. and 6.00 P.M. to 10.00 P.M. and “Off-peak hours” for the purpose of tariff is defined as from 10.00 P.M. to 6.00 A.M. of the next day.

(ii) Tariff as approved shall be applicable in addition to other charges as approved in the Tariff order. Other charges including meter rent and reconnection charges remains unchanged. No meter rent shall be payable after the full cost of the meter is recovered.

(iii) Power factor incentive for HT & EHT consumers will be applicable above power factor of 95%.

(iv) The billing demand in respect of consumer with Contract Demand of less than 110 KVA having static meters should be the highest demand recorded in the meter during the Financial Year irrespective of the Connected Load, which shall required no verification.

(v) A new category, namely ‘Agro-Industrial Consumers’ has been introduced vide OERC Distribution (Condition of Supply)(4th Amendment) Code, 2007. As per Regulation 80 (5)(1) of the said Supply Code, this category relates to supply of power for Pisciculture, Horticulture, Floriculture, Sericulture and other allied agricultural activities including animal husbandry, poultry & cold storage (i.e. a temperature controlled storage where flowers, fruits, vegetables, meat, fish and food, etc. can be kept fresh or frozen until it is needed).

(vi)
Prospective small consumers requiring new connection upto and including 3 KW load shall only pay a flat charge of Rs.500/- towards new connection excluding security deposit as applicable as well as processing fee of Rs.25/-.

(vii) In case of installation with static meter/meter with provision of recording demand, the recorded demand rounded to nearest 0.5 KW shall be considered as the contract demand requiring no verification irrespective of the agreement. Therefore, for the purpose of calculation of Monthly Minimum Fixed Charge (MMFC) for the connected load below 110 KVA, the above shall form the basis.